Foreword
The nature of wastewater from any electric bulb
manufacturjng unit is not so well known. Characterisation of such
a wastewater revealed that using of cutting oil was the major contributing
factor to pollutional load. Furthermore, the owner of the unit put
up a physico-chemical treatment device not requiring any external
source of energy. The performahce and design of the treatment plant
were investigated and the present report narrates the efficiencies
and deficiencies.
The performance
study of the treatment plant was carried out by Shri v. Subramanian,
Assistant Environmental Engineer as the principal investi- gcitor
under the close guidance of Dr. R.H. Siddiqi, Consultant to the
Board.
The other staff
members associated with the monitoring work were the Assistant Environmental
Engineers Shri D.C. Sharma & Shri D.P. Singh, Technical Assistants,
Shri J.S. Yadav & Shri M. Chakraborty and Shri" . N.C. Durgapal,
Apprentice Scientist.
|